Kaifeng Times Plans To Build A 3GW VRFB Production Base By 2026

In Shunhe Hui District, Kaifeng City, Henan Province, a sizable vanadium redox flow battery(VRFB) energy storage system is operating stably. This system, essentially a large “power bank,” can store 1000 KWh of electricity on a single charge, enough to meet the daily electricity needs of an average household for 3 to 5 months.

 

For more information, please visit: https://www.ferroalloynet.com/news/kaifeng_times_plans_to_build_a_3gw_vrfb_production_base_by_2026.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Subscribe to receive daily Vanadium price and news

This will close in 0 seconds