Protean installs V-KOR vanadium battery

Date: Jun 6, 2018

Protean Energy Ltd (ASX: POW) has installed a 25kW (100kWh) V-KOR vanadium battery at the site of OzLinc Industries in O’Connor Perth, Western Australia.

There, it will be used in a micro grid situation aEUR” isolated from the main electrical grid aEUR” in combination with a 21kW solar PV system and a 21kW diesel generator.

Demonstrating the V-KOR vanadium battery in a micro grid situation is the first phase of the company’s Australian trial, with the second phase involving the incorporation and integration of the solar system and the V-KOR battery with the Western Power electricity grid.

The micro grid trial at OzLinc will demonstrate how the V-KOR battery operates as part of an off-grid solution in commercial/industrial premises.

To read full article please click here